Search:  
  Our Products
  Manufacturing Process
  Our Distributors
  Building Tips

Tender Notice  
View PDF (Size 550KB)  

             Read More
HEAD OFFICE
Tel: +254 45 6620627,6622777
Pilot Line: +254 20 3915000
Mobile: +254 722 203076/8
+254 733 333211/12/13/14
Fax: +254 45 66 20406, 66 22378

NAIROBI OFFICE
Taj Towers, Upper Hill
Nairobi, Kenya
Tel: +254 20 8047263
+254 20 2511910/ 911

Concrete Mixes for General Civil Engineering Works.
Concrete for columns, slabs, beams and flooring.

Cement Sand Aggregate Water
Two Bags Two Wheelbarrows Four Wheelbarrows 60 Liters

 

Cement Sand Aggregate Water
Two Bags Two Wheelbarrows Two Wheelbarrows 50 Liters



Recommended time for removal of formwork

Side of Column and Beams 1 Day
Bottom of slabs - up to 4.5 metre span 7 Days
Bottom of slabs - more than 4.5 metre span 14 Days
Bottom of beam - up to 6 metre span 14 Days
Bottom of beam - more than 6 metre span 21 Days
 EAPCC News

To read More about EAPCC News.

Click Here

 Your Feedback
Download Feedback Form

 Social Responsibility

Read More


Design By:
©Copyright 2009.EAPCC.All Rights Reserved.